Replacement of all storm drainage piping at the Gorham School. Included installation of over 2,500lf of new HDPE pipe ranging from 12” to 36”, 200Lf 36” directional drill under existing building and county road, New concrete sidewalk and stairs, new pavement in parking lot, regrade all of the front lawn area. At the Middlesex Valley School, we replaced all sidewalk, stairs, and storm drainage in the front of the building. Storm drainage replacement included installing a 25’ deep manhole and about 80’ of 12” HDPE pipe at 20’ depth. The sidewalk and stair replacement included replacing 9 sets of stairs including handrails and stair nosing’s and all sidewalk leading up to the building. The work at the Middle School/ High School consisted of resurfacing the existing rubber athletic track, construction of a new pull up/ parking area at the middle school including new storm drainage, granite curbing, concrete sidewalk, and new pavement.